Rail works

Davison Earthmovers provides in-depth expertise in the Rail Industry. We contract to various rail organisations as a preferred contractor in Adelaide. With works ranging from environmental controls, total rail construction, excavation & formation construction, pedestrian maze construction, station platform construction and road crossing construction. With our accumulated experience, machinery and technology our effectiveness in the rail industry of South Australia is second to none.

Rail works clients include
  • check
    ARTC
  • check
    DTI (Department of Transport and Infrastructure)
  • check
    PTS (Public Transport Services)
  • check
    ​Broad Spectrum
  • check
    Coleman Rail
  • check
    John Holland Rail
  • check
    Downer
  • check
    ​CR RAIL
  • check
    THEE Rail
  • check
    Laing O’Rourke
  • check
    One Rail (formerly Genesee & Wyoming)
  • check
    SCT Transport
  • check
    BMD

SCT (Special Container Transport), Penfield

SCT (Special Container Transport), Penfield

​Client:

SCT Logistics

​Contract value:

$10 million +

​Description:

​Rail Terminal Construction

​Duration:

5 years + (ongoing)

​Scope of works:

12.5km Rail Formation works.

10km Stormwater works......

Blackwood Retaining Wall

Blackwood Retaining Wall

​Client:

​DPTI

​Contract value:

​$70,000

​Description:

​Stabilise embankment

​Duration:

2 weeks

​Scope of works:

Construct gabion baskets.

Placement of rip rap bags to stabilise bank......

Various Rail ​Projects

​Client:

John Holland, ARTC, Coleman Rail, Downer, BMD, Transfield Services,    

Laing O'Rourke, DPTI, SCT

​Contract value:

​Various

​Description:

Multi faceted

​Duration:

4 hours - 6 months

​Scope of works:

Our capabilities extend from service installation, stormwater,

decribbing, formation construction......

​Watiparinga Stormwater Headwall

​Watiparinga Stormwater Headwall

​Client:

​DPTI - Department of Planning, Transport and Infrastructure

​Contract value:

​$170,000

​Description:

​Construction of gabion basket weir with trash rack in a natural waterway.

​Duration:

3 weeks

3 weeks

​Scope of works:

Liaising with DPTI and ARTC to determine methodology to complete works in between train movements including establishment of plant and materials into a 30m deep valley accessible only from the rail corridor......

​Outer Harbor Freight Terminal Extension

Service 4


​Client:

Mackenzie Intermodal

​Contract value:

$3 million

​Description:

Upgrading and extending existing Train Freight Spur line

​Duration:

3 months

​Scope of works:

Construction of 26,000m2 Heavy Duty Pavement area......