Client Contract Value Duration
Hansen Yunken $4.15 million Completed in April 2024

Description

Davison Earthmovers have been engaged to complete several works Stages for the new SASI facility located in Mile End.

Stage 1: Complete Stage 1  Earthworks

Stage 2a: Complete  Civil works package

Stage 2b: Civil works (Beach Volleyball and Athletics Infrastructure Upgrade works)

 

Scope of Works

Stage 1: Earthworks:-

  • Site Strip and demolition of existing carpark
  • Cut and fill bulk earthworks to building pad bench level.
  • Contaminated PFAS material handling and stockpiling.
  • Set-down preparation for various slab levels.
  • Building plateau pavements and piling pad preparation.
  • Temporary shared path construction and asphalt sealing around the site.

Stage 2a: Civil Works:-

  • Site Strip and demotion of remaining SA Athletics  carpark
  • Crane pad construction and compaction for principal contractor.
  • Re-use of 2,000 tonnes of surplus material generated from Stage 1 to fill carpark to new design levels.
  • Stormwater infrastructure and connection into existing swale.
  • GPT installation and commissioning.
  • Carpark kerbing and concrete wombat crossing prep and pour.
  • Asphalt pavement works.
  • Shared path footpath and light duty concrete footpath preparation.

Stage 2b: Civil Works: – Beach Volleyball and Athletics Infrastructure Upgrade:

  • Tree removal, site strip and vegetation processing
  • Civil demolition and disposal of redundant athletics infrastructure.
  • Drainage and civil preparation for a new pole vault runway, hammer throw cage and shot put disc’s.
  • Landing area shaping and final trimming to comply with world standard requirements.
  • Building pad preparation works.
  • Excavation of four new beach volleyball courts and perimeter kerbing.
  • Supply and installation of FIVB specified approved sand for the beach volleyball courts.

 