Davison Earthmovers was commissioned to deliver a comprehensive scope of works for the development of multiple indoor and outdoor sand training arenas, breakout stables, and police dog training facilities.
Site preparation began with a 300mm average topsoil strip across approximately 88,500m². To achieve the specified subgrade levels, the team completed a cut-to-fill operation involving an estimated 53,500 tonnes of earthworks.
Indoor/outdoor sand training arenas constructed to equestrian standards, including substrate layering and compaction
Road pavements were constructed using multiple layers of imported quarry materials, followed by kerb preparation and pouring. The scope also included the supply and installation of stormwater pits and associated piping systems to manage site drainage effectively.
These works were executed in close coordination with various trades, all of whom demonstrated exceptional commitment and collaboration. The result is a world-class horse training facility that proudly supports the operational needs of South Australia Police.
Site location on the corner of Grand Junction & Briens Road, Northfield.
April 2024