Davison Earthmovers were contracted to turn an existing roadway into a heavy duty trafficable pavement. This are is used for the storage of containers and the loading and unloading of the containers onto the rail network. The size of works was 56,000m2 of hardstand with 2km of rail formation. Significant subgrade remediation was required to provide a sustainable working platform.