Client Contract Value Duration
Aurizon Rail $19.8 million 12 months - completed July 2025

Description

Davison Earthmovers were contracted to turn an existing roadway into a heavy duty trafficable pavement. This are is used for the storage of containers and the loading and unloading of the containers onto the rail network. The size of works was 56,000m2 of hardstand with 2km of rail formation. Significant subgrade remediation was required to provide a sustainable working platform.

 

 

Scope of Works

  • Demolition – Profile and dispose of existing asphalt. Remove and dispose of existing kerbing.
  • Excavate and stockpile 10,000m3 of material. Subgrade improvements.
  • Supply and place 645mm of imported quarry materials.
  • Supply and lay 3 x layers of Portmix Asphalt with reinforcement grid.
  • Line-marking and signage.
  • Supply and place stormwater pits and pipes.
  • Rock pitching to detention basins and swales.
  • Prep and pour kerb and gutter.
  • Prep and pour New Slip Form concrete beam.
  • Supply and install new lights and footings.
  • Supply and place conduits and pits.
  • Installation of CCTV.
  • Inspect, repair and change Luminaire to existing lighting.
  • 5.4km of fibre cable supply and installation.