Drakes Distribution Warehouse
Client Contract Value Duration
Unley Property Group $3.8 Million 1 year

Description

sBulk earthworks, site preparation and civil works for a new distribution centre with a site area of 100,000m2.
Civil works include 6,000m2 of asphalt pavement, 34,000m2 of concrete pavement, 3km of stormwater pipe and numerous ancillary items.

Scope of Works

  • Bulk earthworks including loading dock excavation.
  • Pavement preparation and asphalt supply and lay.
  • Stormwater supply and installation including pump stations, strip drainage and grass-line swale.
  • Council road slip lane works
Project Gallery
Two construction workers, wearing orange shirts, are performing civil works.