Bridgestone Athletics Sports Stadium
Client Contract Value Duration
Polytan $1.6 million (incl GST) 6 months

Description

Construction of Bridgestone Athletics Stadium.

Scope of Works

  • Bulk earthworks including remediation of 1500m3 of non-engineered fill.
  • Lime stabilise existing highly reactive and saturated clay subgrade.
  • Stormwater and sub-soil drainage construction.
  • 9000m2 of geogrid and geofabric installation.
  • 1000m of detailed concrete kerbing and spoon-drain.
  • Pavement preparation. 1000 tonne of asphalt surfacing.
  • (+-) level tolerances on pavements and asphalt.
  • Formation and final trimming of natural turf soccer pitch.
  • Block retaining wall construction and terracing.
  • Swale and batter shaping earthworks.