Civil works, done right

From roadways, pathways and car parks to stormwater, sewer, water and environmental drainage, Davison Contractors delivers a broad range of civil works across South Australia. 

Working directly with engineers and architects, we bring practical experience, skilled people and a hands-on approach to every project, backed by the wider capability of the Symal Group. 

Two construction workers, wearing orange shirts, are performing civil works.

Civil Construction Services Projects

SAPOL Mounted Operations Unit_August 2024_Davison Earthmovers_h

SAPOL Mounted Operations Unit

Davison Earthmovers was commissioned to deliver a comprehensive scope of works for the development of multiple indoor and outdoor sand training arenas, breakout stables, and police dog training facilities.

Site preparation began with a 300mm average topsoil strip across approximately 88,500m². To achieve the specified subgrade levels, the team completed a cut-to-fill operation involving an estimated 53,500 tonnes of earthworks.

Indoor/outdoor sand training arenas constructed to equestrian standards, including substrate layering and compaction

Road pavements were constructed using multiple layers of imported quarry materials, followed by kerb preparation and pouring. The scope also included the supply and installation of stormwater pits and associated piping systems to manage site drainage effectively.

These works were executed in close coordination with various trades, all of whom demonstrated exceptional commitment and collaboration. The result is a world-class horse training facility that proudly supports the operational needs of South Australia Police.

Site location on the corner of Grand Junction & Briens Road, Northfield.

April 2024

 

Gillman Freight Terminal Redevelopment

Davison Earthmovers were contracted to turn an existing roadway into a heavy duty trafficable pavement. This are is used for the storage of containers and the loading and unloading of the containers onto the rail network. The size of works was 56,000m2 of hardstand with 2km of rail formation. Significant subgrade remediation was required to provide a sustainable working platform.

 

 

Yitpi Yartapuultiku Aboriginal Cultural Centre

Davison Earthmovers have been contracted to complete the bulk earthworks and civil package for the new Aboriginal Cultural Centre at Port Adelaide.

 

South Australian Sports Institute (SASI)

Davison Earthmovers have been engaged to complete several works Stages for the new SASI facility located in Mile End.

Stage 1: Complete Stage 1  Earthworks

Stage 2a: Complete  Civil works package

Stage 2b: Civil works (Beach Volleyball and Athletics Infrastructure Upgrade works)

 

Mount Barker Regional Sports Hub

Mount Barker Regional Sports Hub

Stage 1 civil works package for the new Mount Barker Regional Sports Hub.

Adelaide Hills Hockey Club

Adelaide Hills Hockey Club

Construction of a synthetic hockey pitch.

Bridgestone Athletics Sports Stadium

Bridgestone Athletics Sports Stadium

Construction of Bridgestone Athletics Stadium.

Subdivision: 171 Days Road, Regency Park

Subdivision: 171 Days Road, Regency Park

Earthworks, civil and services package for the new 107 block housing development at 171 Days Road, Regency Park

Blakes Crossing Shopping Centre Retaining Wall

Blakes Crossing Shopping Centre Retaining Wall

Construction of new retaining wall to shopping centre car park.

Soil and Groundwater Interception Trench

Soil and Groundwater Interception Trench

​Groundwater contamination barrier.

Kilburn Sportsplex

Kilburn Sportsplex

​Construction of football sports complex.

Sacred Heart College Tennis Courts

Sacred Heart College Tennis Courts

Construction of new tennis courts and long jump pits.

1 / 0