Davison Earthmovers undertake projects for all types of companies directly. We can do just about anything;
Davison Earthmovers offers a total solution – the complete design and construct package. We fully design the area you want developed, specifying the type of pavement, stormwater management etc. to suit the situation. We then project manage and construct the work to full realisation on time and with a quality finish. We work to exceed expectations.
SCT (Special Container Transport), Penfield
| |
| |
| Rail Terminal Construction |
| |
| - Rail formation
- Stormwater
- Shunt Paths
- Roadway
- Building Earthworks
- Container Payment Construction
|
University of Adelaide - Roseworthy Campus
| |
| |
| Bulk earthworks to form 5 water storage lagoons |
| |
| - Live stormwater and waste water management throughout project
- Electical upgrade and installation of aeration and dissolved oxygen metres
- Placement of 40m of 600mm diameter RCP
- HDPE lining to 8000 square metres of lagoon.
- Installation of transfer pipe works
|
M2 Building - Mawson Lakes
| |
| |
| Associated earthworks with building construction |
| |
| - Bulk earthworks to building plateau
- Contamination testing and stockpile management
- Underground water storage tank installation
- Roadways and paving preparation
- Stormwater culvert installations and connections
|
Outer Harbour Frieght Terminal Extension
| |
| |
| Upgrading and extending existing Train Freight Spur Line |
| |
| - Construction of 26,000m2 Heavy Duty Pavement area
|
Saints Road Shopping Centre
| Sarah Construction Contract |
| |
| Construction of new Saints Road Shopping Centre - Civil Duration: 1 year... currently in progess |
| Construction of new Saints Road Shopping Centre - Civil |
| - Bulk earthworks including excavation and filling for new building plateau under level 1 supervision
- Base preparation to the heavy duty concrete road and loading dock
- Construction of new bitumen carpark and driveways including base prep, kerbing and bitumen surface
- Stormwater construction
|
Marion Westfield Shopping Centre
| |
| |
| Site preparation works for new Aldi and mall extension, surrounding pavement and traffic management works. The site was located beneath suspended concrete slab and existing concrete columns adding an additional degree of complexity |
| |
| - Building Pad preparation.including placement of fill
- Stormwater
- Pavement preparation
- Concrete kerbing and pavements
- Relocation of existing palm trees
|
Tea Tree Plaza Westfield Shopping Centre
| |
| |
| Development of Tea Tree Plaza Shopping Centre - Civil |
| |
| - Bulk earthworks including excavation and filling for new building plateau under level 1 supervision
- Base preparation to the heavy duty concrete loading dock
- Construction of concrete footpath to new carpark areas
- Construction of new bitumen carpark and driveways including base prep, kerbing and bitumen surface
- Footing and detailed excavation
- Stormwater construction
- DPTI road works on North East Road modifications
|