Tea Tree Plaza Westfield Shopping Centre

Client:

​Scentre Group

Contract value:

​1,760,000 +GST

Description:

​Development of Tea Tree Plaza Shopping Centre - Civil

Duration:

​1 Year

Scope of works:

  • check
    ​Bulk earthworks including excavation and filling for new building plateau under level 1 supervision
  • check
    ​Base preparation to the heavy duty concrete loading dock
  • check
    ​Construction of concrete footpath to new carpark areas
  • check
    ​Construction of new bitumen carpark and driveways including base prep, kerbing and bitumen surface
  • check
    ​Footing and detailed excavation
  • check
    ​Stormwater construction
  • check
    ​DPTI road works on North East Road modifications
Tea Tree Plaza Westfield Shopping Centre
Tea Tree Plaza Westfield Shopping Centre

Flinders Medical Centre

Client:

​Hansen Yuncken

Contract value:

​$6.4 Million

Description:

​Multi Storey Carpark, Rehabilitation Centre & Mental Health Centre for The Flinders Medical Centre

Duration:

​2 years

Scope of works:

  • check
    ​Demolition Works
  • check
    ​Tree Removal
  • check
    ​Bulk Excavation
  • check
    ​Retaining Walls excavation/construction and backfill
  • check
    ​Link Bridge Construction
  • check
    ​Roadworks
  • check
    ​Kerbing
  • check
    ​Building Pad Preparation
  • check
    ​Line marking & pathway preparation


Watiparinga Stormwater Headwall

Client:

DPTI - Department of Planning, Transport and Infrastructure

Contract value:

$170,000

Description:

Construction of gabion basket weir with trash rack in a natural waterway.

Duration:

3 weeks

Scope of works:

DPTI engaged Davison Earthmovers to undertake work involving :

  • check
    Liaising with DPTI and ARTC to determine methodology to complete works in between train movements including establishment of plant and materials into a 30m deep valley accessible only from rail corridor.
  • check
    Removal of built up vegetation and debris from pipe entry
  • check
    Re-shaping the pipe inlet floor
  • check
    Installation of gabion rock matresses and overflow weir (total 300t of rock)

In order to achieve the required outcome an innovative method for establishment into the site was required involving:

  • check
    Helicopter lifting of earthmoving plant into and out of the valley floor.
  • check
    Use of geofabric slipway for establishment of gabion rock onto valley floor from elevated rail position.
  • check
    Coordination with DPTI equipment including use of hi-rail side tippers.

Use of rubber tyred excavator for access through rail corridor and placement of rock and other materials onto slipway

Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall