Bridgestone Athletics Sports Stadium

Client:

Polytan

Contract value:

$1.6 million (incl GST)

Description:

Construction of Bridgestone Athletics Stadium

Duration:

Commenced NOV 2019 - in progress

Scope of works:

  • check
    Bulk earthworks including remediation of 1500m3 of non-engineered fill.
  • check
    Lime stabilise existing highly reactive and saturated clay subgrade.
  • check
    Stormwater and sub-soil drainage construction.
  • check
    9000m2 of geogrid and geofabric installation.
  • check
    1000m of detailed concrete kerbing and spoon-drain.
  • check
    Pavement preparation. 1000 tonne of asphalt surfacing.
  • check
    (+-) level tolerances on pavements and asphalt.
  • check
    Formation and final trimming of natural turf soccer pitch.
  • check
    Block retaining wall construction and terracing.
  • check
    Swale and batter shaping earthworks.