Blakes Crossing Shopping Centre Retaining Wall

Client:

Shopping Centre Australasia (SCA) Property Group

Contract value:

$350k (incl GST)

Description:

Construction of new retaining wall to shopping centre carpark

Duration:

3 months.

Scope of works:

  • Demolition of existing retaining wall and removal of all existing services including stormwater, lighting, etc.
  • Install new retaining wall and reinstate all services including new stormwater and lighting.
  • Concrete kerbing and walls.
  • New asphalt pavement to carpark areas.




Subdivision: 171 Days Road, Regency Park

Client:

KAS Property Development Group

Contract value:

$3.7 million (incl GST)

Description:

Earthworks, civil and services package for the new 107 block housing development at 171 Days Road, Regency Park.

Duration:

Commenced July 2021..... in progress

Scope of works:

  • Site preparation and cut to fill bulk earthworks.
  • Underground services and certification - sewer, watermain, CST and stormwater.
  • Building pad's construction and asphalt surfacing.
  • 1.6km of concrete kerbing and driveway crossovers.

Taking shape!





















Sam Willoughby BMX Facility, Southern Soccer Facility & Majors Road Upgrade

Client:

Partek Constructions

Contract value:

$3 million (incl GST)

Description:

Earthworks and Civil Package for the new Sam Willoughby BMX Facility, new Southern Soccer Facility and Majors Road Intersection upgrade.

Duration:

Commenced March 2021..... in progress

Scope of works:

  • 67000m3 of cut to stockpile for spectator viewing mounds construction, including shaping and final trim of the mounds.
  • 12,000m2 of carpark construction and spray seal surfacing.
  • 3,500m3 of building pad fill remediation under level 1 control.
  • Swale construction and detention basin earthworks and final trimming.
  • 2km of concrete kerbing and 1,100m2 of footpath construction.
  • Preparation of 3 full sized soccer fields and warm up area.
  • New pavements, deep lift asphalt, lighting and signal upgrade works for DIT Majors Road for the new BMX facility entrance.

Southern Soccer Facility - October 2021

Southern Soccer Facility - November 2021

Sam Willoughby BMX Facility - October 2021

Sam Willoughby BMX Facility - November 2021

Majors Road & Adams Road, O'Halloran Hill upgrade - November 2021

Commencement

Commencement


















Roma Mitchell School Upgrade

Client:

Hansen Yuncken

Contract value:

$1.8 Million

Description:

Civil Construction of two new school building including external pavement and landscaping. This a public private partnership (PPP) project.

Duration:

Commenced  APR 2021 - in progress..

Scope of works:

  • Demolition and bulk earthworks.
  • Building pad preparation.
  • Pavement preparation.
  • Concrete footpath and kerbing.
  • Concrete stairs and amphitheatres.
  • Stormwater drainage system including underground detention tanks.

Norwood Morialta High School Redevelopment

Client:

Lend Lease Building Pty Ltd

Contract value:

$2.5 Million

Description:

Civil Construction for the $52 million expansion of Norwood Morialta High School for the Government of SA Department of Infrastructure & Transport.

Modernising and merging two campuses into one along with expanding the school's capacity to 1700 students. Includes the preparation for a new Three Storey Middle School, Two Storey Home Economics facility, expanded Sporting Facilities, new lift & facade entry, outdoor terrace spaces and carparking.

Duration:

Commenced  SEP 2020 - in progress..

Scope of works:

  • Environmental classification, excavation and offsite disposal of 25,000tonne of material
  • Demolition of existing and construction of over 1km of new stormwater to integrate with the existing dated stormwater network.
  • New access road pavements including 171 space carpark. 
  • Removal and Reinstatement of non-controlled fill under Level 1 Supervision, building base preparation, terrace preparation & retaining walls.
  • 4700m2 of Tennis and Netball Court pavements.

Mount Barker Regional Sports Hub

Client:

Sarah Constructions

Contract value:

$3.7 million (incl GST)

Description:

Stage 1 Civil works package for the new Mount Barker Regional Sports Hub.

Duration:

10 months.

Scope of works:

  • Pavement preparation of two full sized FFSA soccer fields.
  • 28,000m2 of roadway and footpath pavement construction, including double coat spray seal surfacing
  • Building pad's construction work.
  • 2km of stormwater infrastructure and 700m2 of grated drains installation.
  • 2.6km of concrete kerbing.
  • Installation of long spanning Precast Concrete Retaining Wall.
  • Springs Road widening and new lane construction on a DPTI road.





















Bunzl Distribution Centre

Client:

Ahrens

Contract value:

$640k 

Description:

Warehouse with asphalt carpark, loading dock and heavy duty concrete pavement.

Duration:

Commenced SEP 2020 - in progress

Scope of works:

  • check
    Site amenities including cattle grid.
  • check
    Site clearing (strip & stockpile vegetation) and soil remediation.
  • check
    Building pad preparation, LD Asphalt preparation, LD & HD Concrete preparation.
  • check
    Backfill loading dock.
  • check
    Concrete kerbing, line-marking and wheel stops for carpark area.
  • check
    Trim landscaping areas.

Adelaide Hills Hockey Club

Client:

Jim Allen & Associates, Adelaide Hills Hockey Club, Mt Barker City Council

Contract value:

$880,000

Description:

Construction of a Synthetic Hockey Pitch

Duration:

5 months

Scope of works:

  • check
    Managing Contractor.
  • check
    Site preparation - bulk and detailed works.
  • check
    Civil demolition.
  • check
    Stormwater installation.
  • check
    Pavement Construction to within 3mm tolerance.
  • check
    Hotmix to synthetic pitch within 3mm tolerance.
  • check
    Kerbing & pedestrian paving construction.
  • check
    Fencing construction.
  • check
    Construct synthetic surface to International Hockey Pitch Standards.



Sacred Heart College Tennis Courts

Client:

Sacred Heart College

Contract value:

$520,000

Description:

Construction of new tennis courts and long jump pits

Duration:

8 months

Scope of works:

  • Construction of new acrylic coated tennis courts including installation of posts.
  • Stormwater linked to 2m deep cut-ff moisture membrane barrier and soakage trenchs.
  • Court fencing and sheds.
  • Concrete kerbing and paving.
  • Construction of new long jump pits and run up with rubber surfacing.

Bridgestone Athletics Sports Stadium

Client:

Polytan

Contract value:

$1.6 million (incl GST)

Description:

Construction of Bridgestone Athletics Stadium

Duration:

6 months

Scope of works:

  • check
    Bulk earthworks including remediation of 1500m3 of non-engineered fill.
  • check
    Lime stabilise existing highly reactive and saturated clay subgrade.
  • check
    Stormwater and sub-soil drainage construction.
  • check
    9000m2 of geogrid and geofabric installation.
  • check
    1000m of detailed concrete kerbing and spoon-drain.
  • check
    Pavement preparation. 1000 tonne of asphalt surfacing.
  • check
    (+-) level tolerances on pavements and asphalt.
  • check
    Formation and final trimming of natural turf soccer pitch.
  • check
    Block retaining wall construction and terracing.
  • check
    Swale and batter shaping earthworks.