All Posts by 2excel

Various Rail ​Projects

Clients:

John Holland, ARTC, Coleman Rail, Downer, Transfield Services, Laing O'Rourke, Genesee & Wyoming, BMD, DPTI, SCT

Contract value:

​Various

Description:

​-

Duration:

​4 hours - 6 months

Scope of works:

  • check
    ​Services Installation
  • check
    ​Stormwater
  • check
    ​Formation construction
  • check
    ​Decribbing
  • check
    ​Ballast removal, placement and cartage
  • check
    ​Rail construction
  • check
    ​Rail logistics
  • check
    ​Shunter path installation
  • check
    ​Ground stabilising
Various Rail ​Projects
Various Rail ​Projects
Various Rail ​Projects
Various Rail ​Projects
Various Rail ​Projects
Various Rail ​Projects
Various Rail ​Projects
Various Rail ​Projects

​Blackwood Retaining Wall

Client:

​DPTI

Contract value:

​$70,000

Description:

​Stabilise embankment

Duration:

​2 weeks

Scope of works:

  • check
    ​Construct gabion baskets
  • check
    ​Placement of rip rap bags to stabilise bank
  • check
    ​Backfill with no fines concrete
Blackwood Retaining Wall
Blackwood Retaining Wall
Blackwood Retaining Wall

Watiparinga Stormwater Headwall

Client:

DPTI - Department of Planning, Transport and Infrastructure

Contract value:

$170,000

Description:

Construction of gabion basket weir with trash rack in a natural waterway.

Duration:

3 weeks

Scope of works:

DPTI engaged Davison Earthmovers to undertake work involving :

  • check
    Liaising with DPTI and ARTC to determine methodology to complete works in between train movements including establishment of plant and materials into a 30m deep valley accessible only from rail corridor.
  • check
    Removal of built up vegetation and debris from pipe entry
  • check
    Re-shaping the pipe inlet floor
  • check
    Installation of gabion rock matresses and overflow weir (total 300t of rock)

In order to achieve the required outcome an innovative method for establishment into the site was required involving:

  • check
    Helicopter lifting of earthmoving plant into and out of the valley floor.
  • check
    Use of geofabric slipway for establishment of gabion rock onto valley floor from elevated rail position.
  • check
    Coordination with DPTI equipment including use of hi-rail side tippers.

Use of rubber tyred excavator for access through rail corridor and placement of rock and other materials onto slipway

Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall
Watiparinga Stormwater Headwall

M2 Building – Mawson Lakes

Client:

​Hansen Yunken

Contract value:

​$​1.1 million

Description:

​Associated earthworks with building construction

Duration:

​52 weeks

Scope of works:

  • check
    ​​Bulk earthworks to building plateau
  • check
    ​​Contamination testing and stockpile management
  • check
    ​​Underground water storage tank installation
  • check
    ​​Roadways and paving preparation
  • check
    ​​Stormwater culvert installations and connections
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes
M2 Building - Mawson Lakes

University of Adelaide – Roseworthy Campus

Client:

​-

Contract value:

​$​1.2 million

Description:

​Bulk earthworks to form 5 water storage lagoons

Duration:

​20 weeks

Scope of works:

  • check
    ​​Live stormwater and waste water management throughout project
  • check
    ​​Electical upgrade and installation of aeration and dissolved oxygen metres
  • check
    ​Placement of 40m of 600mm diameter RCP
  • check
    ​​HDPE lining to 8000 square metres of lagoon.
  • check
    ​Installation of transfer pipe works
University of Adelaide - Roseworthy Campus
University of Adelaide - Roseworthy Campus
University of Adelaide - Roseworthy Campus
University of Adelaide - Roseworthy Campus
University of Adelaide - Roseworthy Campus
University of Adelaide - Roseworthy Campus
University of Adelaide - Roseworthy Campus
University of Adelaide - Roseworthy Campus

Cirque Du Soleil

Client:

​Cirque Du Soleil

Contract value:

​$700,000

Description:

​21,000m2 rubble and asphalt hard stand installed to tight level controlfor establishment of temporary circus tent structure and facilities.

Duration:

​​Install: 2 weeks, Removal: 2 weeks

Scope of works:

  • check
    ​Placement of geotextile layer over parkland containing contaminated soil.
  • check
    ​​Installation of rubble pavement and asphalt surfacing using 3D robotic grader control system
  • check
    ​​Installation of fround improvement flocks and screw pile foundations for anchoring tent structure.
  • check
    ​​Install communications conduits and pits.
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil
Cirque Du Soleil