Adelaide Hills Hockey Club Client:Jim Allen & Associates, Adelaide Hills Hockey Club, Mt Barker City CouncilContract value:$880,000Description:Construction of a Synthetic Hockey PitchDuration:5 monthsScope of works: check Managing Contractor. check Site preparation - bulk and detailed works. check Civil demolition. check Stormwater installation. check Pavement Construction to within 3mm tolerance. check Hotmix to synthetic pitch within 3mm tolerance. check Kerbing & pedestrian paving construction. check Fencing construction. check Construct synthetic surface to International Hockey Pitch Standards.
Sacred Heart College Tennis Courts Client:Sacred Heart CollegeContract value:$520,000Description:Construction of new tennis courts and long jump pitsDuration:8 monthsScope of works: check Construction of new acrylic coated tennis courts including installation of posts. check Stormwater linked to 2m deep cut-ff moisture membrane barrier and soakage trenchs. check Court fencing and sheds. check Concrete kerbing and paving. check Construction of new long jump pits and run up with rubber surfacing.
Bridgestone Athletics Sports Stadium Client:PolytanContract value:$1.6 million (incl GST)Description:Construction of Bridgestone Athletics StadiumDuration:Commenced NOV 2019 - in progressScope of works: check Bulk earthworks including remediation of 1500m3 of non-engineered fill. check Lime stabilise existing highly reactive and saturated clay subgrade. check Stormwater and sub-soil drainage construction. check 9000m2 of geogrid and geofabric installation. check 1000m of detailed concrete kerbing and spoon-drain. check Pavement preparation. 1000 tonne of asphalt surfacing. check (+-) level tolerances on pavements and asphalt. check Formation and final trimming of natural turf soccer pitch. check Block retaining wall construction and terracing. check Swale and batter shaping earthworks. Download Project Profile here